tasks is 18 minutes. The line will operate for 450 minutes per day.
a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.)
Minimum cycle time minutes
Maximum cycle time minutes
b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal
place. Enter the smaller value in the first box and the larger value in the second box.)
Range of output to units/day
c. What is the minimum number of workstations needed if the maximum output rate is to be sought?
(Round up your answer to the next whole number.)
Minimum number of workstations
d. What cycle time will provide an output rate of 125 units per day? (Round your answer to 1 decimal
place.)
Cycle time min/cycle
e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?
Cycle TimePotential Output
(1) units
(2) units
Solutio
n:
OT = 450 minutes
a. Minimum cycle time = length of longest task, which is
2.4 minutes. Maximum cycle time = task times =
18minutes.
b. Range of output:
450
@ 2.4 min.: 187.5 units
2.4
450
@18 min.:
25
unit
s
18
, Dx t 187.5(18)
c. N 7.5, which rounds to8
OT 450
d. Output 450
OT Solving for CT, CT 3.6 minutes per
cycle 125
CT