The purpose of the Deploy All Resources Action is to instruct all generating resources to be
on line and at full output _________
✓ -:- immediately upon receipt of dispatch instruction
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation
Operators should:
✓ -:- Ensure all unit voltage regulators are in service
PJM can issue the Deploy All Resources Action for________
✓ -:- the entire RTO, specific Control Zones or a subset of a Control Zone if
transmission limitations exist
Under the National Terrorism Advisory System (NTAS) there are 2 types of alerts: Elevated
Threat Alert and __________.
✓ -:- Imminent Threat Alert
1|Page | Grade A+| 2024/2025
, 2024 /2025 | © copyright | This work may not be copied for profit gain | Excel!
A Geomagnetic Disturbance Warning is issued by PJM when the NOAA has issued a
warning or an alert for a potential geo-magnetic storm of severity _______ or greater.
✓ -:- K7
The Generating Capacity reported on a Supplementary Status Report (SSR) includes which
of the following? (Select 2)
✓ -:- Capacity from offline Hydro and CT units that can be synchronized within 10
minutes.
Total Capacity from online Generation.
What is the requested response time for members to reply to a request for SSR data?
✓ -:- 10 Minutes
If a PJM Member has received reports of a terrorism or sabotage threat to their facilities,
they would notify whom at PJM (in addition to NERC and the DOE) to share this
information?
✓ -:- The PJM Shift Supervisor
What is the purpose of a capacity emergency warning? (Select 2)