Control center facilities must have a minimum of how many days of fuel for the backup
generator?
✓ -:- 5 days
If PJM ACE shows overgeneration, actual imports are:
✓ -:- Less than scheduled
Who should a generator contact at PJM to clear an outage ticket?
✓ -:- Master Coordinator
To correct for a slow or fast clock, system frequency schedules are offset by:
✓ -:- +/-.02 Hz
What frequency would PJM set to correct for fast-time error?
✓ -:- 59.98Hz
What frequency would PJM set to correct for slow-time error?
1|Page | Grade A+| 2024/2025
, 2024 /2025 | © copyright | This work may not be copied for profit gain | Excel!
✓ -:- 60.02Hz
What info is on an instantaneous reserve check?
✓ -:- synchronized (regulating and non-regulating), quick start, secondary and beyond
secondary reserves
Generators must provide PJM with a realistic Reactive Capability Curve. This curve must
have no less than __ points, and no more than __ points.
✓ -:- No less than 2 and no more than 8 points
A classic indicator of voltage instability is when system voltages change greatly when...
✓ -:- system loads change by a small amount
Above the line of a D-curve...
✓ -:- Lagging (pushing VARs). Generators will be set there during high-load/low
voltage conditions.
Below the line of a D-curve...