PJM Generation Operation Exam Questions & 100% Correct Answers- Latest Test | Graded A+ | Passed

Beoordeling
-
Verkocht
-
Pagina's
14
Cijfer
A+
Geüpload op
03-09-2024
Geschreven in
2024/2025

Control center facilities must have a minimum of how many days of fuel for the backup generator? -:- 5 days If PJM ACE shows overgeneration, actual imports are: -:- Less than scheduled Who should a generator contact at PJM to clear an outage ticket? -:- Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: -:- +/-.02 Hz What frequency would PJM set to correct for fast-time error? -:- 59.98Hz What frequency would PJM set to correct for slow-time error? 2 0 2 4 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excel! 2 | P a g e | G r a d e A + | 2 0 2 4 / 2 0 2 5 -:- 60.02Hz What info is on an instantaneous reserve check? -:- synchronized (regulating and non-regulating), quick start, secondary and beyond secondary reserves Generators must provide PJM with a realistic Reactive Capability Curve. This curve must have no less than __ points, and no more than __ points. -:- No less than 2 and no more than 8 points A classic indicator of voltage instability is when system voltages change greatly when... -:- system loads change by a small amount Above the line of a D-curve... -:- Lagging (pushing VARs). Generators will be set there during high-load/low voltage conditions. Below the line of a D-curve... 2 0 2 4 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excel! 3 | P a g e | G r a d e A + | 2 0 2 4 / 2 0 2 5 -:- Leading (absorbing VARs). Generators will be set there during low load/high voltage conditions. MWs and MVARs have what kind of relationship? -:- Inverse (increase in MW = decrease in MVARs) How often do generators need to test reactive power capability? -:- Every 5 years The computer hardware and software at each control center shall achieve an availability level of what for those reliability functions directly affect the successful operation of PJM? -:- 99.95% What is EHV? -:- Extra high voltage. Classified as 345kv and above Any generator that is a PJM generation capacity resource that has an RPM Resource Commitment

Meer zien Lees minder
Instelling
PJM Generation Operation
Vak
PJM Generation Operation

Voorbeeld van de inhoud

2024 /2025 | © copyright | This work may not be copied for profit gain | Excel!



PJM Generation Operation Exam Questions
& 100% Correct Answers- Latest Test |
Graded A+ | Passed
Control center facilities must have a minimum of how many days of fuel for the backup

generator?


✓ -:- 5 days




If PJM ACE shows overgeneration, actual imports are:


✓ -:- Less than scheduled




Who should a generator contact at PJM to clear an outage ticket?


✓ -:- Master Coordinator




To correct for a slow or fast clock, system frequency schedules are offset by:


✓ -:- +/-.02 Hz




What frequency would PJM set to correct for fast-time error?


✓ -:- 59.98Hz




What frequency would PJM set to correct for slow-time error?

1|Page | Grade A+| 2024/2025

, 2024 /2025 | © copyright | This work may not be copied for profit gain | Excel!

✓ -:- 60.02Hz




What info is on an instantaneous reserve check?


✓ -:- synchronized (regulating and non-regulating), quick start, secondary and beyond

secondary reserves




Generators must provide PJM with a realistic Reactive Capability Curve. This curve must

have no less than __ points, and no more than __ points.


✓ -:- No less than 2 and no more than 8 points




A classic indicator of voltage instability is when system voltages change greatly when...


✓ -:- system loads change by a small amount




Above the line of a D-curve...


✓ -:- Lagging (pushing VARs). Generators will be set there during high-load/low

voltage conditions.




Below the line of a D-curve...




2|Page | Grade A+| 2024/2025

Geschreven voor

Instelling
PJM Generation Operation
Vak
PJM Generation Operation

Documentinformatie

Geüpload op
3 september 2024
Aantal pagina's
14
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€9,29
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ScholarsAscend Rasmussen College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
313
Lid sinds
2 jaar
Aantal volgers
38
Documenten
25132
Laatst verkocht
15 uur geleden

4,1

59 beoordelingen

5
32
4
11
3
9
2
1
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen