NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 170 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS)

Beoordeling
-
Verkocht
-
Pagina's
24
Cijfer
A+
Geüpload op
21-11-2024
Geschreven in
2024/2025

NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 170 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS)

Instelling
NICET LEVEL 3 HIGHWAY CONSTRUCTION
Vak
NICET LEVEL 3 HIGHWAY CONSTRUCTION

Voorbeeld van de inhoud

NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EX
170 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONAL
(VERIFIED ANSWERS)
Study online at https://quizlet.com/_fw78j6

1. How are lights and luminaires controlled? By a PhotoCell Con-
trol and for circuits
operating at less
than 10 amps, a
Photocell switch is
used

2. What are the three types of inspection? Initial, Interim and
routine

3. How many times per foot should loop wires be 5 twists per foot
twisted?

4. How wide should loops be cut and at what depth? 5/16th Wide and 1
3/4" deep

5. what should be installed on loops wires they cross A plastic sleeve that
a crack or joint? extends 4" past the
joint/crack.

6. How should spare signal conductors be arraigned Spare conductors
inside the box? should be connect-
ed to a terminals. un-
used

7. What should happen prior and during the installa- 1. Clean saw cuts
tion of loops wires? and remove debris
by means of sand-
blasting, water blast-
ing or wire brushing
2. Do not allow ve-
hicles to drive over
open cuts
3. Utilized plas-
tic sleeves between
joints

8. How is loop wire required to be placed? continuously


, NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EX
170 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONAL
(VERIFIED ANSWERS)
Study online at https://quizlet.com/_fw78j6

9. What is placed ontop of continuous loop wires? 2' long Backer Rod

10. What is the required wire slack amount left inside Minimum of 36"
of pull box?

11. How long until subjected live load can be applied to Until concrete meets
anchor bolts? it required 28 day
strength

12. What type of pattern is recommended when tight- The Star Pattern
ening bolts?

13. Prior to erection of traffic lights, What are the ele- 1.Bent or damaged
ments an inspector is looking for? parts
2. damaged coatings
3. Distortions
4. defective fabrica-
tion

14. What elements of a traffic light assembly should be 1.Posts
inspected prior to erection? 2. End Frames
3. Mast arms
4. Trusses

15. How can light poles be erected? Light poles and light
supports can be as-
sembled from the
ground if they con-
tain a short can-
tilevered arms.

16. What are the inspection types for welds? Magnetic Particle
testing (MT) and
dye-penetrant (PT)
testing or ultrasonic
testing

17.


, NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EX
170 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONAL
(VERIFIED ANSWERS)
Study online at https://quizlet.com/_fw78j6
What should be provided if conduit crosses a struc- Metal expansion and
tural joint? deflection fittings

18. What is the dimensions of the copper clad steel Rods should be
rods? 5/8th thick and 8'
long.

19. What are the size of micropiles? Typically less than
12"

20. What is the size of driven piles? Between 12 and 36"

21. What is the required surface temperature for paint- Surface temps must
ing a bridge? be between 50 and
100 degrees

22. When painting a bridge, what must be the humidity 85% or less unless
percentage be? manufactures rec-
ommendations say
otherwise

23. When cleaning unsound paint, how far into the in- Extend the prepared
tact coat should you be? area at least 2
inches into adjacent
tightly adhering, in-
tact coating.

24. When should primer be applied when painting a . Only where paint
bridge? is removed to bare
metal. Otherwise,
apply only intermedi-
ate and finish paints

25. What do the color bonnets on fire hydrants mean? Light Blue -
1,500GPM or above
Green:
1000-1499GPM
Orange: 500 -

Geschreven voor

Instelling
NICET LEVEL 3 HIGHWAY CONSTRUCTION
Vak
NICET LEVEL 3 HIGHWAY CONSTRUCTION

Documentinformatie

Geüpload op
21 november 2024
Aantal pagina's
24
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€21,19
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
ProfIby

Maak kennis met de verkoper

Seller avatar
ProfIby University of Pennsylvania
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5
Lid sinds
1 jaar
Aantal volgers
1
Documenten
1514
Laatst verkocht
8 maanden geleden
Prof Iby

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen