Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ACI Grade 1 Field Testing Certification Practice Test - Irving Questions and Answers 100% Solved correctly

Beoordeling
-
Verkocht
-
Pagina's
10
Cijfer
A+
Geüpload op
09-12-2024
Geschreven in
2024/2025

ACI Grade 1 Field Testing Certification Practice Test - Irving Questions and Answers 100% Solved correctly ASTM C1064 states the container used to measure temperature of concrete must be large enough to provide at least 5 inches of concrete around the sensor. (T or F) - ANSWER - Calibrate the temperature measuring device at least __________, or whenever there is a question of accuracy. - ANSWER -Annually After the thermometer is placed in the concrete: - ANSWER -Gently press concrete around the thermometer According to ASTM C1064, what is one reason to take the temperature of concrete? - ANSWER -Verify conformance It is allowable to remove the temperature measuring devices from the freshly mixed concrete to read the temperature if you cannot see the reading. (T or F) - ANSWER -False The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. (T or F) - ANSWER -False Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. (T or F) - ANSWER -False (15 mins) The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. (T or F) - ANSWER -False (Contamination and rapid evaporation) If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test. (T or F) - ANSWER -False (wet screened) The composite sample not be remixed before beginning any tests. (T or F) - ANSWER -False Sampling should normally be performed, as the concrete is discharged from the mixer. (T or F) - ANSWER -True ASTM Method C172 includes the sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. (T or F) - ANSWER -True After sampling is completed, start the tests for slump and air content within: - ANSWER -None of the above (5 mins) In any case, do not obtain samples until: - ANSWER -All the water and admixtures have been added to the concrete No samples shall be taken before ______ or after ______ of the batch has been discharged. - ANSWER - When strength tests are to be made, the minimum size of the composite sample shall be: - ANSWER -1 cubic foot Sample the concrete from the chute of a truck mixer by: - ANSWER - Fresh concrete to be tested at the job site should be sampled from: - ANSWER - Two or more regularly spaced intervals during discharge of the middle portion of the batch The elapsed time between obtaining the first and final portions of the composite sample, according to ASTM C172, shall not exceed: - ANSWER -None of the above The sides of the slump cone should be tapped with the mallet to consolidate the concrete in the mold. (T or F) - ANSWER -False For the slump test, when Rodding the second layer and the top layer, the tamping rod should just penetrate into the underlying layer. (T or F) - ANSWER -True According to ASTM C143, it is permissible to use a mold, which clamps to a nonabsorbent base. (T or F) - ANSWER -True When filling the final layer of the slump cone, never heap the concrete above the top of the mold. (T or F) - ANSWER -False The filling of the slump cone should be done in three layers of equal height. (T or F) - ANSWER -False The slump test may be done on any flat surface. (T or F) - ANSWER -False When filling the slump cone, each layer should be rodded 25 times. (T or F) - ANSWER -True The slump cone is filled in three layers of equal volume. (T or F) - ANSWER - True Concrete should be removed from around the base before the cone is lifted. (T or F) - ANSWER -True The slump cone should be raised carefully, vertically upward, in a steady motion in ________ Seconds - ANSWER -3 to 7 The elapsed time between the start of filling the slump cone and the removal of the cone must be no more than: - ANSWER -2 1/2 minutes The slump should be measured to the nearest - ANSWER -Quarter of an inch In order to determine slump, you should measure the vertical distance from: - ANSWER -Top of the mold to the displaced original center of the top surface

Meer zien Lees minder
Instelling
ACI Grade 1 Field Testing Certification
Vak
ACI Grade 1 Field Testing Certification

Voorbeeld van de inhoud

ACI Grade 1 Field Testing Certification Practice Test -
Irving Questions and Answers 100% Solved correctly
ASTM C1064 states the container used to measure temperature of concrete must
be large enough to provide at least 5 inches of concrete around the sensor. (T or F)
- ANSWER -

Calibrate the temperature measuring device at least __________, or whenever
there is a question of accuracy. - ANSWER -Annually

After the thermometer is placed in the concrete: - ANSWER -Gently press
concrete around the thermometer

According to ASTM C1064, what is one reason to take the temperature of
concrete? - ANSWER -Verify conformance

It is allowable to remove the temperature measuring devices from the freshly
mixed concrete to read the temperature if you cannot see the reading. (T or F) -
ANSWER -False

The maximum allowable time between obtaining the first and last portions of the
composite sample may not exceed 5 minutes. (T or F) - ANSWER -False

Start molding specimens for strength tests within 30 minutes after fabricating the
composite sample. (T or F) - ANSWER -False (15 mins)

The composite concrete sample must be protected from sun, wind, contamination
and rapid evaporation. (T or F) - ANSWER -False (Contamination and rapid
evaporation)

If the concrete contains aggregates larger than those that are appropriate for a size
of mold or equipment used, the sample should be wet-sieved before making the
test. (T or F) - ANSWER -False (wet screened)

, The composite sample not be remixed before beginning any tests. (T or F) -
ANSWER -False

Sampling should normally be performed, as the concrete is discharged from the
mixer. (T or F) - ANSWER -True

ASTM Method C172 includes the sampling from stationary mixers, paving
mixers, truck mixers, agitators, and non-agitating equipment. (T or F) - ANSWER
-True

After sampling is completed, start the tests for slump and air content within: -
ANSWER -None of the above (5 mins)

In any case, do not obtain samples until: - ANSWER -All the water and
admixtures have been added to the concrete

No samples shall be taken before ______ or after ______ of the batch has been
discharged. - ANSWER -

When strength tests are to be made, the minimum size of the composite sample
shall be: - ANSWER -1 cubic foot

Sample the concrete from the chute of a truck mixer by: - ANSWER -

Fresh concrete to be tested at the job site should be sampled from: - ANSWER -
Two or more regularly spaced intervals during discharge of the middle portion of
the batch

The elapsed time between obtaining the first and final portions of the composite
sample, according to ASTM C172, shall not exceed: - ANSWER -None of the
above

The sides of the slump cone should be tapped with the mallet to consolidate the
concrete in the mold. (T or F) - ANSWER -False

Geschreven voor

Instelling
ACI Grade 1 Field Testing Certification
Vak
ACI Grade 1 Field Testing Certification

Documentinformatie

Geüpload op
9 december 2024
Aantal pagina's
10
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€7,95
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TheExamMaestro Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
144
Lid sinds
2 jaar
Aantal volgers
5
Documenten
3351
Laatst verkocht
11 uur geleden
Exam Vault

Exam Vault is your trusted destination for high-quality exam materials and study resources. We provide a wide rage of tests and prep guides to help you succeed, whether you're preparing for academic exams, certifications, or professional assessments

3,6

18 beoordelingen

5
9
4
2
3
2
2
0
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen