F-60 Fireguard test questions with correct
answers
For |hot |work |operation |with |citywide |permit, |the |owner |of |the |premises |of |the |hot |work |operation |
areas |must |be |notified |in |writing |by |the |citywide |permit |holder |______ |the |hot |work |is |to |be |started.
|- |VERIFIED |ANSWER✔✔-at |least |48 |hours |before
The |pre-hot |work |check |must |be |conducted |by |the |responsible |person |before |hot |work |is |authorized |
and |__________ |- |VERIFIED |ANSWER✔✔-least |once |per |day.
The |check |reports |must |be |kept |at |the |work |site |during |the |work, |made |available |for |inspection |by |a |
representative |of |the |FDNY, |and |maintained |on |the |premises |for |a |minimum |of |- |VERIFIED |
ANSWER✔✔-48 |hours |after |work |is |complete.
A |pre-hot |work |check |must |be |conducted |at |least |- |VERIFIED |ANSWER✔✔-once |per |day
Hot |work |operations |involving |cutting |or |welding |shall |be |conducted |at |least |- |VERIFIED |ANSWER✔✔-
35 |feet |from |combustible |materials |and |combustible |waste
All |other |hot |work |operations |shall |be |conducted |at |least |- |VERIFIED |ANSWER✔✔-25 |feet |from |
combustible |materials |and |combustible |waste
Sprinkler |system |protection |____________while |hot |work |is |performed. |- |VERIFIED |ANSWER✔✔-must
|not |be |shut |off |or |impaired
When |should |a |Fire |watch |be |maintained |- |VERIFIED |ANSWER✔✔-A |fire |watch |must |be |maintained |
during |any |hot |work |operation.
What |other |duties |should |the |Fire |Watch |have |while |on |hot |water |operations. |- |VERIFIED |
ANSWER✔✔-The |persons |conducting |a |fire |watch |shall |not |have |other |duties.
answers
For |hot |work |operation |with |citywide |permit, |the |owner |of |the |premises |of |the |hot |work |operation |
areas |must |be |notified |in |writing |by |the |citywide |permit |holder |______ |the |hot |work |is |to |be |started.
|- |VERIFIED |ANSWER✔✔-at |least |48 |hours |before
The |pre-hot |work |check |must |be |conducted |by |the |responsible |person |before |hot |work |is |authorized |
and |__________ |- |VERIFIED |ANSWER✔✔-least |once |per |day.
The |check |reports |must |be |kept |at |the |work |site |during |the |work, |made |available |for |inspection |by |a |
representative |of |the |FDNY, |and |maintained |on |the |premises |for |a |minimum |of |- |VERIFIED |
ANSWER✔✔-48 |hours |after |work |is |complete.
A |pre-hot |work |check |must |be |conducted |at |least |- |VERIFIED |ANSWER✔✔-once |per |day
Hot |work |operations |involving |cutting |or |welding |shall |be |conducted |at |least |- |VERIFIED |ANSWER✔✔-
35 |feet |from |combustible |materials |and |combustible |waste
All |other |hot |work |operations |shall |be |conducted |at |least |- |VERIFIED |ANSWER✔✔-25 |feet |from |
combustible |materials |and |combustible |waste
Sprinkler |system |protection |____________while |hot |work |is |performed. |- |VERIFIED |ANSWER✔✔-must
|not |be |shut |off |or |impaired
When |should |a |Fire |watch |be |maintained |- |VERIFIED |ANSWER✔✔-A |fire |watch |must |be |maintained |
during |any |hot |work |operation.
What |other |duties |should |the |Fire |Watch |have |while |on |hot |water |operations. |- |VERIFIED |
ANSWER✔✔-The |persons |conducting |a |fire |watch |shall |not |have |other |duties.