QUESTIONS AND CORRECT DETAILED ANSWERS (100%VERIFIED ANSWERS)
|AGRADE
1. I do a ____ after replacing a spout to a Healy 900 nozzle - ANSWER-shut off
test
.10. The ____ is the valve that controls pressure and vacuum on the tank. -
ANSWER-P/V Valve
.11. The vapor piping must be all, but not - ANSWER-Compatible with
underground environment.
.12. The Shear Valve is installed ____ - ANSWER-At the base of the dispenser.
.13. What is the max length of a Healy Hose Phase 2? - ANSWER-20 Feet.
.14 A ___ is a component of the hanging hardware that separates when it's
applied a force? - ANSWER-Breakaway.
.15. UL listed means all except : - ANSWER-Worldwide Approved.
.16. After a drive off, a technician should not - ANSWER-Ask attendant to fill out
a drive off accident report.
.17. The executive order 201-A says that the reconnection of the breakaway
needs to be - ANSWER-Logged in the maintenance GDF.
, .18. What is not a secondary containment testing method? - ANSWER-Statistical
Inventory Reconciliation.
.19. The air clean seperator must be located in the GDF - ANSWER-No more than
100 ft from the vent riser.
.2. In a balance hose the gasoline flows in - ANSWER-Inner hose
.20. The PEI-500 recommends that to avoid being shocked by electricity or
soaked with gasoline that? - ANSWER-You must disconnect power to all electric
devices.
.21. Which of these refer to a vapor recovery stage 1? - ANSWER-Delivery of
gasoline and UST.
.22. Which is not part of the hanging hardware? - ANSWER-Shear Valve
.23. What is not apart of a stage 2 vapor recovery? - ANSWER-Monitoring
equipment
.24. To install a Healy Z083B Vapor Vac Kit you need the following tools except -
ANSWER-Stretching copper tool
.25. After July 1 2004 continuous monitoring on secondary containment is
required on? - ANSWER-Tanks, sumps, UDC where single wall pipe is present.