Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

FL Business and Finance Practice LATEST UPDATED 2025/2026 Test WITH COMPLETE Questions And SURE VERIFIED SOLUTIONS GRADED AT A+ SCORE!!

Beoordeling
-
Verkocht
-
Pagina's
22
Cijfer
A+
Geüpload op
11-07-2025
Geschreven in
2024/2025

FL Business and Finance Practice LATEST UPDATED 2025/2026 Test WITH COMPLETE Questions And SURE VERIFIED SOLUTIONS GRADED AT A+ SCORE!! 1. The owner must prove financial capability no later than ________ days prior to the expiration of the time for withdrawal of bids. A. 3 B. 5 C.7 D.30 - ANSWER Answer: C. 7 - AIA 701.6.2 2. Which of the following is a first aid treatment not to be recorded on an OSHA # 200 log? A. administering a tetanus immunization B. administering a rabies immunization C. application of bandages or a butterfly dressing in lieu of sutures. D. a minor accident involving a loss of consciousness. - ANSWER Answer: A. Administering a tetanus immunization - CM 7-24 3. Which of the following is NOT true about corporations? A. With an "S" corporation there is no corporate tax - you pay taxes individual. B. Closely held corporations operate more informally. C. There is no limit of shareholders for either a C-type or S-type Corpo. D. C-type corpo have the possibility of double taxation. - ANSWER Answer: C There is no limit of shareholders - CM 1-13 4. What is the term for expenses that are actually paid but not recognized as paid until a later period? A. post paid costs B. deferred assets C. accrued expenses D. long-term liabilities - ANSWER Answer: B. deferred assets - BGA 242 5. How many copies of the plans and specifications shall the contractor maintain on site? A. 1 B. 2 C. 3 D. 4 - ANSWER Answer: A. 1 - AIA201 2.3.6 6. Contracts entered into by unlicensed contractors ________________. A. are immoral B.are illegal C. are enforceable D. are unenforceable - ANSWER Answer: D. are unenforceable - CM 2-94 489.128 7. The subcontractor agrees that all work shall be done subject to the final approval of the ______________________. A. architect B. contractor C. both A & B are correct D. none of the above - ANSWER Answer: C. A & B are correct - AIA 401.4.2.5 8. Which of the following is NOT exempt from chapter 489? A. An employee of a licensee who is subordinate of a construction licensee acting within the scope. B. Owners of a property with a cost of $85,000. C. Contractors in work on bridges and roads. D. Anybody doing work of a minor nature - less $1,000 or less. - ANSWER Answer B. Owners of property $85,000 - CM 2-63 489.103 Limit is $75,000. 9. The architect has the sole responsibility for ordering __________________. A. Change orders B. Construction change directives C. any minor change of work D. any changes whatsoever - ANSWER Answer: C. any minor change in work - AIA 201 7.1.2 10. When considering the location of your office, which of the following is not a consideration? A. Zoning Ordinances B. Demographic makeup of community C. Building Permits D. Flood Prone Area Maps - ANSWER Answer: B. Demographic Makeup - CM 1-15 11. The bonding cost for a class "B" contract of $900,000 will cost ________________. A. $9,000 B. $10,000 C. $12,500 D. $22,500 - ANSWER Answer: C. $12,500 CM 4-18 Graduated scale: 1st- 100x25%+ 2,500 2nd 400 x15%+ 6,000 3rd 400x 10%=4,000 Total $12,500 12. A project is to be considered abandoned after _________ days if the contractor just terminates the project without notification to the owner and without cause. A. 30 B. 60 C. 45 D. 90 - ANSWER Answer D. 90 - CM 2-96 , 489.129.1.j 13. If, at the end of a quarter, a contractor's total FUTA tax is $150, the contractor _____________________. A. may add the tax to the amount for deposit for the next quarter B. must deposit the tax during the 1st month after the quarter. C. must deposit the tax during the 2nd month after the quarter D. must deposit the tax during the 3rd month after the quarter. - ANSWER Answer: A. Add the tax for the next quarter - CM 3-183 14. What is the maximum amount of compensation that a consumer is entitled to if injured on a jobsite due to an unlicensed contractors negligence? A. 2X the amount of damages. B. 2x the amount of damages plus attorney fees. C. 3X the amount of damages D. 3x the amount of damages, plus attorney's fees - ANSWER Answer: D. 3x the amount plus attorney fees - CM 2-14 15. When developing a project schedule, which of the following should not influence the development of the project shedule? A. manpower B. equipment schedules C. completion date D. activity durations - ANSWER Answer: C Completion date - CM 10-63 16. A contractor must serve a copy fo the claim of lien on the owner and lender (if any) within how many days of the date the claim of lien is recorded? A. 15 B. 30 C. 60 D. 90 - ANSWER Answer: A. 15 CM 9-30 17. According to the Statutes of Limitations, how long does a person have to bring action on a wage recovery claim? A. 2 yrs B. 5 yrs C. 7 yrs D. 10 yrs - ANSWER Answer: A - 2 years - CM 5-30 18. Categories on the income statement include all the following except ___________________. A. Revenues B. Expenses C. Inventory D. Income - ANSWER Answer: C. Inventory - CM 3-30 19. Unless otherwise required in the Bidding Documents, the Agreement for the Work will be written on AIA Document ____________. A. A201 B. 401 C. A701 D. A101 - ANSWER Answer: D. A101 - AIA 701 - Article 8 20. If a construction company's federal employment taxes for the quarter ending Sept 30th have been paid on time, the IRS Form 941 for the quarter ending Sept 30th must be filed not later than ________________. A. Oct 10th B. Oct 31st C . Nov 10th D Nov 30th - ANSWER Answer: C. Nov 10th - CM 3-156 21. What type of insurance is issued to protect the contractor for loss of earnings or revenue as a result of damage to or destruction of buildings or equipment? A. Business Interruption B. Business Floater C. General Liability D. Contractor Protective Liability - ANSWER Answer: A. Business Interruption - CM 4-8 22. What are premiums ofr builder's risk insurance based on? A. minimum value at risk B. actual value at risk C. maximum value at risk D. quality of construction in place - ANSWER Answer: C. Maximum value at risk - CM 4-15 23. A building inspection may be denied, according to Contractors Manual, for lack of _____________________. A. an authorized contractor's agent on the job B. a recorded Notice of Commencement posted on the job site C. an inspection box provided to protect job documents D. notification to the owner of the pending inspection. - ANSWER Answer: B. a recorded Notice of Commencement posted on the job site. - CM 9-77 713.135.1.d 24. Network analysis consists of many separate but interrelated operations. These are ___________________. A. events B. timetables C. activities D. bar charts - ANSWER Answer: C. activities - CM 10-70 25. Which of the following is true regarding a general contractor

Meer zien Lees minder
Instelling
Florida Business And Finance
Vak
Florida Business And Finance

Voorbeeld van de inhoud

FL Business and Finance Practice
LATEST UPDATED 2025/2026 Test
WITH COMPLETE Questions And
SURE VERIFIED SOLUTIONS
GRADED AT A+ SCORE!!


1. The owner must prove financial capability no later than ________
days prior to the expiration of the time for withdrawal of bids. A. 3
B. 5 C.7 D.30 - ANSWER ✔ Answer: C. 7 - AIA 701.6.2


2. Which of the following is a first aid treatment not to be recorded
on an OSHA # 200 log? A. administering a tetanus immunization
B. administering a rabies immunization C. application of bandages
or a butterfly dressing in lieu of sutures. D. a minor accident
involving a loss of consciousness. - ANSWER ✔ Answer: A.
Administering a tetanus immunization - CM 7-24


3. Which of the following is NOT true about corporations? A. With
an "S" corporation there is no corporate tax - you pay taxes
individual. B. Closely held corporations operate more informally.
C. There is no limit of shareholders for either a C-type or S-type
Corpo. D. C-type corpo have the possibility of double taxation. -
ANSWER ✔ Answer: C There is no limit of shareholders - CM 1-
13

,4. What is the term for expenses that are actually paid but not
recognized as paid until a later period? A. post paid costs B.
deferred assets C. accrued expenses D. long-term liabilities -
ANSWER ✔ Answer: B. deferred assets - BGA 242




5. How many copies of the plans and specifications shall the
contractor maintain on site? A. 1 B. 2 C. 3 D. 4 - ANSWER ✔
Answer: A. 1 - AIA201 2.3.6


6. Contracts entered into by unlicensed contractors
________________. A. are immoral B.are illegal C. are
enforceable D. are unenforceable - ANSWER ✔ Answer: D. are
unenforceable - CM 2-94 489.128


7. The subcontractor agrees that all work shall be done subject to the
final approval of the ______________________. A. architect B.
contractor C. both A & B are correct D. none of the above -
ANSWER ✔ Answer: C. A & B are correct - AIA 401.4.2.5


8. Which of the following is NOT exempt from chapter 489? A. An
employee of a licensee who is subordinate of a construction
licensee acting within the scope. B. Owners of a property with a
cost of $85,000. C. Contractors in work on bridges and roads. D.
Anybody doing work of a minor nature - less $1,000 or less. -

, ANSWER ✔ Answer B. Owners of property $85,000 - CM 2-63
489.103 Limit is $75,000.


9. The architect has the sole responsibility for ordering
__________________. A. Change orders B. Construction change
directives C. any minor change of work D. any changes
whatsoever - ANSWER ✔ Answer: C. any minor change in work -
AIA 201 7.1.2


10. When considering the location of your office, which of the
following is not a consideration? A. Zoning Ordinances B.
Demographic makeup of community C. Building Permits D. Flood
Prone Area Maps - ANSWER ✔ Answer: B. Demographic Makeup
- CM 1-15


11. The bonding cost for a class "B" contract of $900,000 will
cost ________________. A. $9,000 B. $10,000 C. $12,500 D.
$22,500 - ANSWER ✔ Answer: C. $12,500 CM 4-18 Graduated
scale: 1st- 100x25%+ 2,500 2nd 400 x15%+ 6,000 3rd 400x
10%=4,000 Total $12,500


12. A project is to be considered abandoned after _________
days if the contractor just terminates the project without
notification to the owner and without cause. A. 30 B. 60 C. 45 D.
90 - ANSWER ✔ Answer D. 90 - CM 2-96 , 489.129.1.j

Geschreven voor

Instelling
Florida Business And Finance
Vak
Florida Business And Finance

Documentinformatie

Geüpload op
11 juli 2025
Aantal pagina's
22
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€12,37
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Exchequer Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
74
Lid sinds
1 jaar
Aantal volgers
1
Documenten
1451
Laatst verkocht
2 dagen geleden
EXEMPLARY SERVICE IN ACADEMIA EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I CAN DO ASSIGNMENTS, EXAMS,ESSAYS AND RESEARCH PROJECTS FOR YOU EVEN AT STRICT DEADLINES. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, FREE of any fee.

Lees meer Lees minder
3,0

9 beoordelingen

5
4
4
0
3
1
2
0
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen