Answered Correct Graded A+.
You have created an asset master data record. Which other master data record can be created
synchronously?
Please choose the correct answer.
a) Functional location
b) Cost center
c) Equipment
d) Primary cost element - Answer c)
What does Management Accounting provide?
There are 2 correct answers to this question.
a) Profitability analysis of market segments
b) Information used for internal areas of responsibility
c) Reports that meet accounting standards and principles
d) Account balances for customers and vendors - Answer a)
b)
Which step in the order to cash business process integrates with profitability analysis?
Please choose the correct answer.
a) Saving a transfer order
b) Generating an invoice
c) Creating an outbound delivery
d) Generating a sales order - Answer b)
At which points in the order-to-cash process are postings made to the general ledger?
There are TWO correct answers for this Question.
a) Posting a goods issue
b) Saving the sales order
c) Saving the invoice
,Please choose the correct answer.
a) To summarize G/L postings at the controlling area level
b) To update multiple ledgers for parallel accounting
c) To fill the segment characteristic in all line items
d) To summarize CO line items to produce fewer line items - Answer c)
In what step of the purchase-to-pay process is a purchase requisition generated?
Please choose the correct answer.
a) Determination of requirements
b) Source of supply determination
c) Vendor selection
d) Invoice verification - Answer a)
Within a MRP net requirements calculation, which of the following are demand elements?
There are 3 correct answers to this question.
a) Purchase order
b) Planned independent requirements
c) Safety stock
d) On hand inventory
e) Sales order - Answer b)
c)
e)
What assigns actual costs to a project?
Please choose the correct answer.
a) Calculating project interest
b) Saving a purchase order
c) Posting a vendor's invoice
d) Processing a cost forecast - Answer c)
How do you view all records created for an employee?
, d) Personnel file - Answer d)
Which of the following functions can result in a creation of reservations for a production order?
There are 2 correct answers to this question.
a) Release production order
b) Convert planned order to production order
c) Record manufacturing activities
d) Calculate production cost - Answer a)
b)
What are some of the trends driving the need for a re-engineered business suite built for the
digital?
3 correct answers
a. Massive increase in device connectivity
b. Business users are taking on more IT tasks
c. Increase in ownership of mobile devices
d. Adoption of cloud computing - Answer a.
b.
d.
Why was the application code completely re-written for SAP S/4 HANA?
2 correct answers
a. The optimized ABAP code that we developed for Suite on HANA would not work with SAP S/4
HANA
b. To take advantage of the simpler data model
c. SAP S/4 HANA is now built with JAVA
d. To ensure that the code is optimized for SAP HANA - Answer b.
d.
SAP S/4 HANA is built to natively integrate with business networks such as
4 correct answers
a. SAP Ariba