complete solutions graded A+
Operational Risk Management - correct answer ✔✔ - a decision making process that helps to
assess hazard within the work center.
-3500.39C
- 5 steps
*identify hazards
*assess the situation
*make risk decisions
*implement controls
*supervise
4 principles (ORM) - correct answer ✔✔ 1. anticipate and manage risk by planning.
2. accept no unnessesarry risk.
3. accept risk only when benefits outweigh the costs.
4. make risk decisions at the appropriate level.
3 levels (ORM) - correct answer ✔✔ in depth
-used in training
deliberate
-used in briefs
,time critical
-used in emergency situations
Publications - correct answer ✔✔ daily
- A1-H60RA-MRC-300
turnaround
- A1-H60CA-MRC-100
CV NATOPS
- 00-80T-105
NATOPS Navy flight manual
- A1-H60RA-NFM-000
Hand signals
- 00-80T-113
General A/C information
-plane Captain's manual
Fuel sampling
- A1-H60RA-GAI-000, WP 008 00
Move procedures
, - A1-H60RA-GAI-000
- 17-1-537
Publication index
- 01-700
AWSE(armament weapons support equipment)
- 11-140-25
Hearing protection requirements - correct answer ✔✔ single
-50 ft of APU turning
- 200 ft of engines turning
double
- 30 ft of a/c turning or APU running for extended periods of time.
85 decibels (need hearing protection)
sections of the aircraft - correct answer ✔✔ -nose
-cabin
-transition
-tail cone
-tail rotor
-main rotor