Materials needed to perform the required maintenance are found on the -
ANSWER ✓ front of MRC
The responsibility to replace a missing MRC belongs to the - ANSWER ✓ Work
Center Supervisor
Who assists the department head in managing maintenance at the division level? -
ANSWER ✓ Division Officer
Who has the responsibility to maintain the list of effective pages? - ANSWER ✓
Work Center Supervisor
Which schedule is NOT used in the 3-M System? - ANSWER ✓ Daily
Which of the following periodicity code is used when a maintenance requirement
is performed monthly - ANSWER ✓ M
Which document is used to verify that you have the proper MRC? - ANSWER ✓
MIP
Material needed to perform a specific PMS action is listed on the - ANSWER ✓
MRC
You must check the ________ _________ to ensure that the weekly schedule is
correct. - ANSWER ✓ Quarterly schedule
, The maintenance procedure steps on the MRC are.... - ANSWER ✓ To be
followed precisely.
The shipboard hazardous material list is provided _________ on the DOD CD-
ROM. - ANSWER ✓ Quarterly
Requirements for storage of hazardous material are found at the ____. - ANSWER
✓ MSDS
While grinding or chiseling, what should be used to protect the eyes? - ANSWER
✓ Chipping goggles
Which procedure does NOT require eye protection? - ANSWER ✓ Normal
operation of a lube oil system.
Personnel Qualification Standards sets a minimum level of knowledge and skill
that must be attained to qualify for a watchstation - ANSWER ✓ True
Who updates and maintains the PQS progress chart? - ANSWER ✓ workcenter
supervisor
The PQS progress chart is reviewed by... on a ... basis - ANSWER ✓ Division
Officer; Weekly
Which Section in the PQS book breaks down the subject equipment into smaller
and more easily understood components and component parts? - ANSWER ✓
Systems
Which of the following sections of the PQS book contains the basic knowledge
needed to understand duties to be performed? - ANSWER ✓ Fundamentals
Who is authorized to sign off individual line items in a PQS book? - ANSWER ✓
Qualifiers
To get a PQS line item signed off, the trainee must be able to answer or perform
task for that particular item. - ANSWER ✓ True
, Which of the following tools are used to retrieve small items that fall into places
unreachable by hand? - ANSWER ✓ Flexible retrieving tools
The type of wrench that requires calibration for accuracy is the ... wrench -
ANSWER ✓ torque
it is NOT safe to operate electrical power tools in areas where ... are present. -
ANSWER ✓ Flammable Gases
Electrical power tools must be inspected prior to issue by a qualified ... -
ANSWER ✓ Electrician
Torque wrenches are used to measure.... - ANSWER ✓ foot or inch/pounds
a torque wrench has to be tested and calibrated for accuracy - ANSWER ✓ True
When using a torque wrench with an extension the torque applied to the fastener
will.... - ANSWER ✓ be different than the torque indicated on wrench dial
The time required to complete all maintenance listed on the EGL should not
exceed .... hours - ANSWER ✓ 8
The PMS master file contains maintenance requirement information that pertains
to all equipment of a command - ANSWER ✓ True
The effective use of available manpower and material resources is the objective of
the.... - ANSWER ✓ 3m System
What provides a listing of all maintenance index pages (MIPs) applicable to a
particular work center? - ANSWER ✓ List of effective pages(LOEP)
The list of all maintenance actions for a specific or similar equipment/systems is
called a ... - ANSWER ✓ Maintenance index page(MIP)
Which of the following provides a detailed procedure for performing preventive
maintenance? - ANSWER ✓ MRC