INF3708 Software Project Management

University of South Africa

Hier vind je de beste samenvattingen om te slagen voor INF3708 Software Project Management. Er zijn o.a. samenvattingen, aantekeningen en oefenvragen beschikbaar.

Alle 15 resultaten

Sorteer op:

INF3708 - Software Project Management_Summary.
  • Samenvatting

    INF3708 - Software Project Management_Summary.

  • INF3708 - Software Project Management_Summary.*Characteristics that distinguish projects: [10]1 Non-routine tasks are involved. Planning is required. Specific objectives are to be met or a specified product is to be created. The project has a predetermined time span. Work is carried out for someone other than yourself. Work involves several specialisms. People are formed into a temporary work group to carry out the task. Work is carried out in several phases. The resources that...
  • DoctorReinhad
    $4.09 Meer Info
INF3708 - Software Project Management_ASS_ANSWERS.
  • Tentamen (uitwerkingen)

    INF3708 - Software Project Management_ASS_ANSWERS.

  • INF3708 - Software Project Management_ASS_ANSWERS.2. Software Project Management scope normally comprises the following: a. Project Feasibility b. Project Initiation c. Project Planning d. Project Execution e. Project Control f. Project Termination Which of the above combination is correct for Project Management scope? 1. a, b, e, and f only. 2. a, c, and e only. 3. b, d, and f only. 4. a, b, c, d, e, and f. 5. a, b, c, and e only. 3. Within the Project Execution activity, project m...
  • DoctorReinhad
    $4.09 Meer Info
INF3708 assignment 03 for semester 1. Solution for assignment 03 Questions
  • Tentamen (uitwerkingen)

    INF3708 assignment 03 for semester 1. Solution for assignment 03 Questions

  • INF3708 assignment 03 for semester 1. Solution for assignment 03 Questions INF3708 assignment 03 for semester 1. Solution for assignment 03 Questions
  • lectdenis
    $3.99 Meer Info
INF3708-Questions and Answers.
  • Tentamen (uitwerkingen)

    INF3708-Questions and Answers.

  • Part 2 of 3 - Multiple Choice Questions Question 1 of 25 1.0 Points Which knowledge area involves defining and managing all the work required to complete the project successfully?  A. Project resource management  B. Project scope management  C. Project time management  D. Project cost management Reset Selection Question 2 of 25 1.0 Points What actions result in improvements in project performance?  A. Corrective  B. Defective  C. Preventive INF3708-Que...
  • Sensational
    $3.99 Meer Info
INF3708_exam_memos.
  • Tentamen (uitwerkingen)

    INF3708_exam_memos.

  • Question 1 Define the following terms in the context of Software Project Management 1.1 Project Specific plan or design or planne dundertaking 1.2 Planning Composition of project scope where normally an outline plan for project is detailed This may include: Work/Product Breakdown Standards Risk Management 1.3 Net Profit Difference between net cost and total income of project over the life of the project 1.4 Payback Period Time taken to break even or pay back the initial investment N...
  • LOVELY01
    $3.79 Meer Info
INF3708 EXAM NOTES
  • Tentamen (uitwerkingen)

    INF3708 EXAM NOTES

  • Cost-benefit evaluation techniques Formula for ROI Example of using ROI ROI for a project with net profit of R50k over a 5 year period Average annual profit: 50 000 / 5 = 10 000 Annual profit = R10k and a total investment of R100k ROI = 10 000 / 100 000 *100 = 10%   Discount factor t = the number of years into the future that the cash flow occurs r = the discount rate (annual rate by which future earnings are discounted) PV: Present value of a future cash flow NPV: Net present ...
  • LOVELY01
    $3.99 Meer Info
INF3708_Proj_Man_Summary - v2.
  • Samenvatting

    INF3708_Proj_Man_Summary - v2.

  • Look at the past uploaded exam papers for questions structures samples. The structures are similar to the assignments done in the semester work. General: Basic concepts and definitions (5 Marks) This question consists of five multiple choice sub-questions Marks are awarded according to the number of correct answers provided by the student. 1. The basis of successful project management is: 1. Identifying the project stake holder’s objectives 2. Ensuring that these objectives are met 3. ...
  • LOVELY01
    $3.79 Meer Info
INF3708 DRAWING A CPM DIAGRAM (ACTIVITY-ON-ARROW)
  • Tentamen (uitwerkingen)

    INF3708 DRAWING A CPM DIAGRAM (ACTIVITY-ON-ARROW)

  • EXAMPLE 1: Consider the list of tasks with dependencies and estimated durations (in weeks) in the table below: 1. Draw a CPM network for the list of tasks in the table above to illustrate the interaction of activities. 2. Identify the critical path and its duration. 3. After carefully considering the problem again, the project team decides that an alternative to the original plan would be to extend the duration of activity C to four weeks. This would allow activity E to drop to three week...
  • LOVELY01
    $3.79 Meer Info
INF3708 EXAM PACK
  • Tentamen (uitwerkingen)

    INF3708 EXAM PACK

  • 1.1 Specific plan/design or planned undertaking 1.2 Project scope where outline plan is detailed Includes: Work/Product Breakdown - Standards - Risk Management 1.3 Difference between net cost and total income of project over the life of the project 1.4 Time taken to break even or pay back initial investment 1.5 Uncertain event/condition – may have positive or negative effect on project Invisibility – Progress not immediately visible - process of making the invisible visible Complexity...
  • ExellentStudyResources
    $3.99 Meer Info
Wil jij je uitgaves terugverdienen?
Hoeveel heb je al uitgegeven op Stuvia? Stel je eens voor dat alle andere studenten JOU betalen voor je samenvatting. Ka-ching!