INF3708 Software Project Management
University of South Africa
Hier vind je de beste samenvattingen om te slagen voor INF3708 Software Project Management. Er zijn o.a. samenvattingen, aantekeningen en oefenvragen beschikbaar.
Alle 15 resultaten
Sorteer op:
-
Voordeelbundel
INF3708 - Software Project Management Summary & ANSWERS Solutions (Highlighted) - Assignment 01 – Semester 1.
-
---2mei 2022
- INF3708 - Software Project Management Summary & ANSWERS Solutions (Highlighted) - Assignment 01 – Semester 1.
-
$5.99 Meer Info
Tutorexpert01
-
Samenvatting
INF3708 - Software Project Management_Summary.
-
---28maart 20222021/2022
- INF3708 - Software Project Management_Summary.*Characteristics that distinguish projects: [10]1 
 Non-routine tasks are involved. 
 Planning is required. 
 Specific objectives are to be met or a specified product is to be created. 
 The project has a predetermined time span. 
 Work is carried out for someone other than yourself. 
 Work involves several specialisms. 
 People are formed into a temporary work group to carry out the task. 
 Work is carried out in several phases. 
 The resources that...
-
$4.09 Meer Info
DoctorReinhad
-
Tentamen (uitwerkingen)
INF3708 - Software Project Management_ASS_ANSWERS.
-
---8maart 20222021/2022A+
- INF3708 - Software Project Management_ASS_ANSWERS.2. Software Project Management scope normally comprises the following: 
a. Project Feasibility 
b. Project Initiation 
c. Project Planning 
d. Project Execution 
e. Project Control 
f. Project Termination 
Which of the above combination is correct for Project Management scope? 
1. a, b, e, and f only. 
2. a, c, and e only. 
3. b, d, and f only. 
4. a, b, c, d, e, and f. 
5. a, b, c, and e only. 
3. Within the Project Execution activity, project m...
-
$4.09 Meer Info
DoctorReinhad
-
Tentamen (uitwerkingen)
INF3708 assignment 03 for semester 1. Solution for assignment 03 Questions
-
--114februari 20222021/2022A+
- INF3708 assignment 03 
for semester 1. 
Solution for assignment 
03 Questions 
INF3708 assignment 03 
for semester 1. 
Solution for assignment 
03 Questions
-
$3.99 Meer Info
lectdenis
-
Tentamen (uitwerkingen)
INF3708-Questions and Answers.
-
---20december 20212021/2022A+
- Part 2 of 3 - Multiple Choice Questions 
Question 1 of 25 
1.0 Points 
Which knowledge area involves defining and managing all the work required to complete the 
project successfully? 
 
A. Project resource management 
 
B. Project scope management 
 
C. Project time management 
 
D. Project cost management 
Reset Selection 
Question 2 of 25 
1.0 Points 
What actions result in improvements in project performance? 
 
A. Corrective 
 
B. Defective 
 
C. Preventive 
INF3708-Que...
-
$3.99 Meer Info
Sensational
-
Tentamen (uitwerkingen)
INF3708_exam_memos.
-
---18november 20212021/2022A+
- Question 1 
Define the following terms in the context of Software Project Management 
1.1 Project 
Specific plan or design or planne dundertaking 
1.2 Planning 
Composition of project scope where normally an outline plan for project is detailed 
This may include: Work/Product Breakdown 
Standards 
Risk Management 
1.3 Net Profit 
Difference between net cost and total income of project over the life of the project 
1.4 Payback Period 
Time taken to break even or pay back the initial investment 
N...
-
$3.79 Meer Info
LOVELY01
-
Tentamen (uitwerkingen)
INF3708 EXAM NOTES
-
---135november 20212021/2022A+
- Cost-benefit evaluation techniques 
Formula for ROI 
Example of using ROI 
ROI for a project with net profit of R50k over a 5 year period 
Average annual profit: 
50 000 / 5 = 10 000 
Annual profit = R10k and a total investment of R100k 
ROI = 10 000 / 100 000 *100 = 10% 
Discount factor 
t = the number of years into the future that the cash flow occurs 
r = the discount rate (annual rate by which future earnings are discounted) 
PV: Present value of a future cash flow 
NPV: Net present ...
-
$3.99 Meer Info
LOVELY01
-
Samenvatting
INF3708_Proj_Man_Summary - v2.
-
---23november 20212021/2022
- Look at the past uploaded exam papers for questions structures samples. The structures are 
similar to the assignments done in the semester work. 
General: Basic concepts and definitions (5 Marks) 
This question consists of five multiple choice sub-questions 
Marks are awarded according to the number of correct answers provided by the student. 
1. The basis of successful project management is: 
1. Identifying the project stake holder’s objectives 
2. Ensuring that these objectives are met 
3. ...
-
$3.79 Meer Info
LOVELY01
-
Tentamen (uitwerkingen)
INF3708 DRAWING A CPM DIAGRAM (ACTIVITY-ON-ARROW)
-
---11november 20212021/2022A+
- EXAMPLE 1: 
Consider the list of tasks with dependencies and estimated durations (in weeks) in the table below: 
1. Draw a CPM network for the list of tasks in the table above to illustrate the interaction of 
activities. 
2. Identify the critical path and its duration. 
3. After carefully considering the problem again, the project team decides that an alternative 
to the original plan would be to extend the duration of activity C to four weeks. This would 
allow activity E to drop to three week...
-
$3.79 Meer Info
LOVELY01
-
Tentamen (uitwerkingen)
INF3708 EXAM PACK
-
---40november 20212021/2022A+
- 1.1 Specific plan/design or planned undertaking 
1.2 Project scope where outline plan is detailed 
Includes: Work/Product Breakdown - Standards - Risk Management 
1.3 Difference between net cost and total income of project over the life of the project 
1.4 Time taken to break even or pay back initial investment 
1.5 Uncertain event/condition – may have positive or negative effect on project 
Invisibility – Progress not immediately visible - process of making the invisible visible 
Complexity...
-