INF3708 Software Project Management

University of South Africa

Hier vind je de beste samenvattingen om te slagen voor INF3708 Software Project Management. Er zijn o.a. samenvattingen, aantekeningen en oefenvragen beschikbaar.

Pagina 2 van de 15 resultaten

Sorteer op:

INF3708 EXAM NOTES 2021.
  • Samenvatting

    INF3708 EXAM NOTES 2021.

  • Cost-benefit evaluation techniques Formula for ROI Example of using ROI ROI for a project with net profit of R50k over a 5 year period Average annual profit: 50 000 / 5 = 10 000 Annual profit = R10k and a total investment of R100k ROI = 10 000 / 100 000 *100 = 10%   Discount factor t = the number of years into the future that the cash flow occurs r = the discount rate (annual rate by which future earnings are discounted) PV: Present value of a future cash flow NPV: Net present ...
  • ExellentStudyResources
    $3.99 Meer Info
INF3708-Questions and Answers.
  • Tentamen (uitwerkingen)

    INF3708-Questions and Answers.

  • Part 2 of 3 - Multiple Choice Questions Question 1 of 25 1.0 Points Which knowledge area involves defining and managing all the work required to complete the project successfully?  A. Project resource management  B. Project scope management  C. Project time management  D. Project cost management Reset Selection Question 2 of 25 1.0 Points What actions result in improvements in project performance?  A. Corrective  B. Defective  C. Preventive INF3708-Que...
  • ExellentStudyResources
    $3.79 Meer Info
INF3708 EXAM STUDY NOTES.
  • Tentamen (uitwerkingen)

    INF3708 EXAM STUDY NOTES.

  • INF3708 EXAM STUDY NOTES. PERT network diagram PERT (Program Evaluation Review Technique) network diagram is used to model a project’s activities and their relationships as a network. It was developed to take account of the uncertainty surrounding estimates of task durations. The difference between the CPM and the PERT methods is that the CPM uses a single estimate for the duration of each task, whereas the PERT method uses 3 estimates. These 3 estimates include Optimistic (a) Most lik...
  • ExcelAcademia2026
    $4.49 Meer Info
INF3708_ASSIGNMENT ANSWERS
  • Tentamen (uitwerkingen)

    INF3708_ASSIGNMENT ANSWERS

  • INF3708 - Software Project Management. INF3708_ASSIGNMENT ANSWERS. Software Project Management scope normally comprises the following: a. Project Feasibility b. Project Initiation c. Project Planning d. Project Execution e. Project Control f. Project Termination Which of the above combination is correct for Project Management scope? 1. a, b, e, and f only. 2. a, c, and e only. 3. b, d, and f only. 4. a, b, c, d, e, and f. 5. a, b, c, and e only. 3. Within the Project Execution activ...
  • ExcelAcademia2026
    $4.19 Meer Info
INF3708 EXAM SUMMARY.
  • Samenvatting

    INF3708 EXAM SUMMARY.

  • INF3708 EXAM SUMMARY. Software Project Management. Characteristics that distinguish projects: [10]1 Non-routine tasks are involved. Planning is required. Specific objectives are to be met or a specified product is to be created. The project has a predetermined time span. Work is carried out for someone other than yourself. Work involves several specialisms. People are formed into a temporary work group to carry out the task. Work is carried out in several phases. The resources ...
  • ExcelAcademia2026
    $4.19 Meer Info
Teveel maand over aan het eind van je geld?
€5,99 voor je samenvatting, vermenigvuldigt met 100 medestudenten... Reken maar uit: dat is veel geld! Wees geen dief van je eigen portemonnee en start nu met uploaden.