ICC
Latest uploads at ICC. Looking for notes at ICC? We have lots of notes, study guides and study notes available for your school.
-
674
- 0
-
46
All courses for ICC
-
ICC 674
-
Icc, 1
Latest content ICC
spill prevention equipment consists of a spill bucket that is intended for.... - Answer Catching product when transfer hose is detached. 
 
Which statement regarding manual inventory reconciliation is true..... - Answer it is no longer an approved method of non-visual monitoring of existing UST systems. 
 
An approved method of leak detection for an underground pressurized piping system includes... - Answer A device that automatically restricts product flow through piping. 
 
Under Dispens...
- Package deal
- Exam (elaborations)
- • 5 pages's •
-
ICC•ICC
-
UST Service Technician Bundle set• By cracker
ICC Practice questions with correct answers
- Package deal
- Exam (elaborations)
- • 2 pages's •
-
ICC•ICC
-
UST Service Technician Bundle set• By cracker
What is the maximum horizontal spacing for support of 3/4" CPVC pipe? correct answer: 3' 
 
What does ASHRAE stand for? correct answer: American Society of Heating, Refrigeration and Air Conditioning Engineers (Ref. Standards) 
 
What is the 4th of the seven basic steps for special inspections? correct answer: Prescribe on-site and final report requirements and give the requirements to the agencies. 
 
Drainage tiles shall be placed on a minimum of ________ inches of washed gravel or crushe...
- Package deal
- Exam (elaborations)
- • 4 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom
(T/F) Gasoline vapors are lighter than air correct answer: False: Gas vapors are 3-4 times HEAVIER than air 
 
Overfill Protection notifies the operator when tank is at what level capacity? correct answer: If equipped it will notify audibly and visually when the tank reaches 90% Capacity. 
 
Cathodic protection systems must be inspected by a certified cathodic protection tester within______ months of installation correct answer: 6 months 
 
Annual Monitor Certification records must be maintai...
- Package deal
- Exam (elaborations)
- • 13 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom
Corrosion Specialist correct answer: designs and certifies cathodic protection system 
 
Secondary containment shall be constructed to contain at least the following volumes: correct answer: A. 100% of usable capacity of primary where there is only one primary is within the secondary 
B. 150% of the largest container if there are multiple primary containers in a single secondary 
 
Cathodic protection tester will test cathodic protection system within __ months of installation and every __ yea...
- Package deal
- Exam (elaborations)
- • 5 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom
After backfilling the vapor return and vent lines, the maximum pressure drop through the system shall not exceed ________at 60 cubic feet per hour as determined by TP-201.4, Dynamic Backpressure. 
 
a. 0.75 inches WC 
b. 0.5 inches WC 
c. 0.32 inches WC 
d. 0.55 inches WC correct answer: c. 0.5 inches WC 
 
CARB's most recent vapor recovery regulations are known as: 
 
a. EVR (enhanced vapor recovery) 
b. CVR (California vapor recovery) 
c. PVR (protective vapor recovery) 
d. ORVR (onboard ref...
- Package deal
- Exam (elaborations)
- • 19 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom
Which of the following is not considered "hanging hardware"? 
 
a. nozzle 
b. swivel 
c. whip hose 
d. shear valve correct answer: d. shear valve 
 
Per Executive Order. VR-201-E, if the dispensing vacuum of the Healy VP-1000 pump is below ____ inches of WC, the dispenser should be removed from service. 
 
A. 50 
B. 60 
C. 75 
D. 100 correct answer: B. 60 
 
In a coaxial hose for a balance system, the product flows through the ____? 
 
A. the belllows 
B. the inner hose 
C. the outer hose 
D...
- Package deal
- Exam (elaborations)
- • 18 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom
1. Under ground _______________ storage systems are not longer needed or suitable for product storage must be properly disposed of properly correct answer: A. Gas 
B. Oil 
C. Petroleum 
D. All of the above 
Answer. C 
 
2. All work that is completed at the site must be accomplished in accordance with federal, state, and local requirements as well as accepted safety standards. correct answer: A. True 
B. False 
Answer: True. 
 
3. All applicable permits must be obtained prior to beginning any ...
- Package deal
- Exam (elaborations)
- • 10 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom
Phase 1 equipment is related to all of the following except: correct answer: Dispenser mounted vapor recovery equipment 
 
According to EO VR-201/202-N, the only authorized hose configuration is: correct answer: Any Hose Configuration 
 
The most current ARB approved Phase II vapory recovery is: correct answer: EVR 
 
When a certified Healy Technician is replacing the VP 1000 during operational hours, they should do all of the following to eliminate the potentials problem except: correct answ...
- Package deal
- Exam (elaborations)
- • 10 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom
spill prevention equipment consists of a spill bucket that is intended for.... correct answer: Catching product when transfer hose is detached. 
 
Which statement regarding manual inventory reconciliation is true..... correct answer: it is no longer an approved method of non-visual monitoring of existing UST systems. 
 
An approved method of leak detection for an underground pressurized piping system includes... correct answer: A device that automatically restricts product flow through piping...
- Package deal
- Exam (elaborations)
- • 5 pages's •
-
ICC•ICC
-
ICC TESTS COMPILATION BUNDLE• By Classroom