- Samenvattingen en Aantekeningen
Op zoek naar een samenvatting over ? Op deze pagina vind je 3 samenvattingen over .
Alle 3 resultaten
Sorteer op:
-
Tentamen (uitwerkingen)
CSFSM S-56 Exam Prep Questions and Correct Answers/ Latest Update / Already Graded
-
---29maart 20252024/2025A+
- OS&Y 
Ans: Outside Stem & Yoke. 
Shall be locked by chain in the open position. 
 
When is a CSFSM needed? 
Ans: When the building is more than 250', more than 20 storis, or covers 
more than 200,000 sf. 
 
Air Horn Signaling Duration 
Ans: 3 second horn blast with a 10 second pause in between. 
 
*A long continuous horn blast mans all clear. 
 
2 | Page 
 
Muster Point 
Ans: Site location all workers shall go to in case of emergency. 
 
CDA 
Ans: Construction De...
-
$14.49 Meer Info
Expert1
-
Tentamen (uitwerkingen)
CSFSM S-56 Exam Questions and Correct Answers/ Latest Update / Already Graded
-
---17maart 20252024/2025A+
- F-01 
Ans: COF for impairment 
 
F-60 
Ans: COF for fire guard for torch operation and construction site 
 
G-60 
Ans: Torch operation 
 
P-54 
Ans: Crane serial fueling operation at construction site 
 
S-92 
2 | Page 
 
Ans: Supervision of portable fueled space heaters 
 
S-93 
Ans: Supervising temporary storage and dispensing flammable or 
combustible liquids 
 
E-21 
Ans: Using powder activated tools 
 
A-49 
Ans: Supervision of aerosals
-
$13.99 Meer Info
Expert1