A Class A license is required when a single contract is more than
- answer-$120,000
A Class A or B licensee MUST operate
- answer-under the name the license was issued
A construction project does not require inspection if the cost is less than this
MAXIMUM amount:
- answer-$2500
A contractor does not notify a change of address and so does not receive a timely
Notice of Renewal. Who is responsible when the contractor does not renew his
license on time?
- answer-the licensee Contractor
A contractor is required to submit a renewal within __________ days of the
expiration date?
- answer-30
A contractor MUST apply reinstatement rather than renewal if the renewal
application and fee are NOT submitted within how many days of the expiration
date?
- answer-30
A copy of the building permit MUST be
- answer-posted on the construction site
A designated employee must work a minimum of how many hours for a licensed
contracting business:
- answer-30 hours
, A designated employee should be?
- answer-At least 18 years old, full time employee, has passed required
examination.
a license was issued on 10/15/2003. the expiration date is_______________.
- answer-10/31/2005
A new building may be used after_____________ is issued.
- answer-certificate of occupancy
A notification that funds are due is issued, but the funds are not paid. After a
second notice, the funds must be paid in__________ days. If there is still no
payment, then the license is ___________.
- answer-30, suspended
A permit has been issued and construction is underway. The inspection must take
place in:
- answer-six months
A written stop work order MUST be given to
- answer-a owner, owner's agent, r the contractor doing the work
ABC Contracting is building an addition to a house for Ms.Smith. Mrs.Smith has
paid draws to cover the foundation and framing. The framing materials have been
delayed in arriving. Rather than sit idle waiting for the materials, ABC decides to
apply the funds received for the framing to begin the foundation work on an
addition being contracted for another for Mrs. Jones. ABC knows when Mrs. Jones
pays the draw for the foundation completion, ABC can use these funds to pay for
the Smith framing materials which should arrive at the same time. This is...
- answer-an example of misapplication of funds
ACME builder contracts a cement driveway for Mrs.Bee. During construction, the
home owner decides she needs the driveway to be wider to have an easier access to
the garage. The contractor agrees to increase the width at an additional cost and
Mrs.Bee agrees to pay for the licensee. Once construction has been completed,
Mrs. Bee refuses to pay for the increase saying the contractor estimated the
contract incorrectly. The homeowner has no legal obligation to pay for the increase
because the......
- answer-contractor failed to prepare a change order to the contract and have the
homeowner sign it