Mobile Crane NCCER Study Guide Questions And Answers |Latest 2025 | Guaranteed Pass
-
--26March 20252024/2025A+
- ©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+ 
1 | P a g e 
Mobile Crane NCCER Study Guide 
Questions And Answers |Latest 2025 | 
Guaranteed Pass 
When determining the "gross load" the best method is: - AnswerGet an accurate load weight 
and add the rigging 
By order of strength which is correct - AnswerBasket, Vertical, Choker 
Primary purpose for a roster sheave or auxiliary boom point sheave is to: - AnswerSeparate 
the hoist line 
When the number of layers of rope on a drum increase t...
-
$10.99 More Info
Fyndlay
-
Exam (elaborations)
Tower Crane Exam Questions and Answers 100% Pass
-
---11December 20242024/2025A+
- Tower Crane Exam Questions and 
Answers 100% Pass 
Which of the following OSHA regulations govern suspended personnel platforms? - ANSWER - 
OSHA 1926.1431 
According to ASME B30.3 The prohibited zone for power lines that are 60 kV is - ANSWER -15 ft 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of - ANSWER -5 
to 1 
According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging 
hardware is - ANSWER -5 to 1 
According to...
-
$12.99 More Info
EmilyCharlene
-
Exam (elaborations)
Mobile Crane NCCER Study Guide Questions and Answers 100% Pass
-
---5December 20242024/2025A+
- Mobile Crane NCCER Study Guide 
Questions and Answers 100% Pass 
When determining the "gross load" the best method is: - ANSWER -Get an accurate load weight and 
add the rigging 
By order of strength which is correct - ANSWER -Basket, Vertical, Choker 
Primary purpose for a roster sheave or auxiliary boom point sheave is to: - ANSWER -Separate the 
hoist line 
When the number of layers of rope on a drum increase the : - ANSWER -Allowable line pull decreases 
What is the minimum allowable d...
-
$11.99 More Info
EmilyCharlene
-
Exam (elaborations)
Crane practice test #3 Questions and Answers 100% Pass
-
---15December 20242024/2025A+
- Crane practice test #3 Questions and 
Answers 100% Pass 
If the operator is setting up the crane alone, which of the following is required? 
A. Overhead power lines must be at least 10ft over the boom 
B. Wind speed cannot exceed on the Beaufort 
C. The red cones designating the work zone must be set up 
D. Stabilizers shall be visible to the operator when extending and setting - ANSWER -D. Stabilizers 
shall be visible to the operator when extending and setting 
Before the boom is un-stowed fro...
-
$12.99 More Info
EmilyCharlene
-
Exam (elaborations)
Mobile Crane Questions Test #1 Questions and Answers 100% Pass
-
---5December 20242024/2025A+
- Mobile Crane Questions Test #1 
Questions and Answers 100% Pass 
Where is the best location for leveling a crane? - ANSWER -Upperworks. 
When determining the gross load the best method is? - ANSWER -Get an accurate load weight and 
add the rigging. 
By order of hitch strength, which is the correct answer? - ANSWER -Basket, vertical, choker. 
What is the primary purpose of using a jib? - ANSWER -Increase height. 
When taking a side strain on a boom, what concerns the operator most? - ANSWER -Boom...
-
$11.99 More Info
EmilyCharlene
-
Exam (elaborations)
Overhead Crane Test Questions and Answers 100% Pass
-
---10December 20242024/2025A+
- Overhead Crane Test Questions and 
Answers 100% Pass 
Overhead cranes with more than one hoisting unit shall have what? - ANSWER -its rated load 
marked on it 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - ANSWER -removes power 
to entire crane 
How often does O.S.H.A. require a written wire rope inspection? - ANSWER -once a month 
Most loads should be rigged to within how many degrees of level? - ANSWER -five 
According to ASME B30.2, what is the safety factor fo...
-
$12.99 More Info
EmilyCharlene
-
Exam (elaborations)
Boat Operations / Crane Exam Questions and Answers 100% Pass
-
---2December 20242024/2025A+
- Boat Operations / Crane Exam 
Questions and Answers 100% Pass 
What is the safe working load of the articulating knuckle boom Crane? - ANSWER -22,046 Lbs 
What is the safe working load of the aviation bridge Crane? - ANSWER -4,300 Lbs 
Who is overall responsible for all the Crane? - ANSWER -Ships Bosn 
What are 2 methods of deploying small boat? - ANSWER -Articulating knuckle boom crane and Caley 
davit 
What are the minimum required positions for a boat crew? - ANSWER -5 , Coxswain , Boat offic...
-
$8.49 More Info
EmilyCharlene
-
Exam (elaborations)
Articulating Boom Crane Test #3 Exam Questions and Answers 100% Pass
-
---6December 20242024/2025A+
- Articulating Boom Crane Test #3 Exam 
Questions and Answers 100% Pass 
When setting up the ABC crane and using the stabilizers, when would cribbing be required? 
A. Loamy soil 
B. Sandy soil 
C. Unstable soil 
D. All of the above - ANSWER -D. All of the above 
What is the required clearance per ASME for a power line rated at 150 KV? 
A. 10 feet 
B. 15 feet 
C. 20 feet 
D. 25 feet - ANSWER -B. 15 feet 
When attaching a shackle to a crane hook, which part of the shackle goes to the load? 
A. The p...
-